23? 24? Foot Tolman Skiff Build - Nanaimo

It was @cracked_ribs I believe his instagram handle was or is double eagle island. He doesn't appear to be a member of the site anymore.
 
Last edited:
More weekend progress. Front portside panels dry fit. I'm applying the glass/epoxy to the inside of the panels on a horizontal surface because its way easier. Portside should be fully attached at some point tomorrow night.

Have been messing with the temp laser, can measure 1-3 degree exotherm on the epoxy while curing. I am experimenting with cranking the heat to 27-28c to see if I can measure when curing is mostly complete by the exotherm ending instead of waiting 24 hours. At 27 degrees it turns super hard in around 18 hours, but still isn't effectively sandable until 48 hours
 

Attachments

  • PXL_20240114_185751417.jpg
    PXL_20240114_185751417.jpg
    325.9 KB · Views: 34
  • PXL_20240113_191826919.jpg
    PXL_20240113_191826919.jpg
    102.6 KB · Views: 34
  • IMG_20240112_202226_951.jpg
    IMG_20240112_202226_951.jpg
    84.1 KB · Views: 34
1000017996.jpg

Mad gains on the build last night. Had the big crew come and help fillet, and tape the chines, bow, sides and transom then set all the glass in epoxy over the entire hull in a single session. About 300 square feet of glass + 120 feet of tape over all the joints.

Just finished first flood coat, one more this evening. Then fairing time.
 
Last edited:
In case you don't know, this is a HUGE time saver when fairing. I make my own cutting ~1/8" tall triangular notches into the plastic bondo spreaders. You can leave an 1/8" gap between the notches. That way you get fairly spread out ridges that sand really fast.

1705899851534.png
 
Back
Top